Phase 2 – DETACHED HOUSE IN ALHAURÍN DE LA TORRE

Architecture
Detached House Alhaurin de la Torre July 2019 3

We have finished the horizontal and vertical structure of the detached house: the whole frame is complete!

In the photos you can see the combination of the steel vertical structure (columns) and the concrete wall that forms the staircase.

You can already make out the double height between the living room and the first-floor landing, and the texture of the exposed concrete with the timber panelling of the walkway has worked out well.

Now it’s time for the external and internal walls… onwards!

 

Detached House Alhaurin de la Torre

Detached House Alhaurin de la Torre

Detached House Alhaurin de la Torre

Detached House Alhaurin de la Torre

Detached House Alhaurin de la Torre

 

Recent posts

Previous Post
“LOVA” CAFÉ. Calle Carretería 56 (Málaga)
Next Post
Valparaíso House September 2019

Request information

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Fill out this field
    Fill out this field
    Please enter a valid email address.
    You need to agree with the terms to proceed

    Contactar por WhatsApp