BACKGROUND, SURROUNDINGS AND PREVIOUS CONDITION
Winning a public architecture competition is always a challenge for a studio, as the initial proposal has to be adapted to the client’s requirements in terms of cost and priority needs. In this case, collaboration with the Málaga Chamber of Commerce was complete, resolving the day-to-day issues on site during construction and achieving a satisfying result
The aim was to convert an industrial building into a business incubator meeting the requirements of the brief detailed below.
The building is located in an industrial area, the Polígono Norte in San Pedro de Alcántara, a very dynamic area where new businesses are constantly being created.
PROJECT DESCRIPTION
USES
In line with the brief, the uses have been arranged as follows:
-Ground floor: Administration and reception area, meeting room and training room.
This level is the formal meeting place, with a video-conferencing meeting room and basic services for anyone who does not occupy an office but wants a quick, practical meeting.
This floor is completed with offices
-First floor: Offices. Exclusively for internal work
FORM
Determined by the position of the stairs and lift shaft, that “strip” becomes the location of the wet areas, general services and vertical circulation.
The offices are arranged in a comb layout in the central area, completed at each end, as appropriate, by support or shared services.
Para romper la monotonía de las oficinas, se han generado distintos planos inclinados, que comprimen y amplían el recorrido, generando la identidad propia del edificio desde su interior
BIO-SMART ARCHITECTURE FEATURES
In terms of passive comfort and savings, the intervention stands out for its use of materials:
-Eco-friendly flooring is used: corridors (linoleum) and meeting rooms and offices (bamboo).
-All plumbing is made of polybutylene, which is recyclable and non-toxic.
-Indoor and outdoor spaces are lit with low-energy lighting.
– A smart opening system is installed at the building’s main entrance